Core hole that was drilled down to the embedded pipe
FIRST ENERGY
 
Contracting Agent:
First Energy
 
Project Location:
Blairstown, NJ
 
Project Highlights:
Atlantic Subsurface Imaging performed Ground Penetrating Radar (GPR) scanning at a First Energy Plant to locate approximately 70' of 12" diameter pipe embedded in the concrete. Our sister company, Atlantic Concrete Cutting, then core drilled a 5" diameter hole 7' down and into the pipe.


Removed concrete from the core drilling operation

Removed section of the pipe from the core drilling operation.


back to projects
Contact Us | Visit Atlantic Concrete Cutting